2025 In April, Bulgarian Mining Group finally reached a strategic cooperation with UNIQUE after a 3-month global equipment selection, and ordered the full prepayment of the ZGYX-452 intelligent blasting drilling rig and the supporting crushing production line, and the equipment will be shipped from the port of Ningbo at the end of next month to help the customer build the country’s first intelligent open-pit iron ore mine. project.
The ZGYX-452 drilling rig is equipped with a dual-power intelligent control system, which increases the impact power by 35% through remote commissioning, ensuring fast perforation efficiency in basalt layers.
The whole system has passed the CE certification of the European Union, and the emission of dust is lower than 15 mg/m³.
When the customer’s inspection team visited the UNIQUE intelligent blasting rig at the manufacturing base through the online conference video:
Full-process digital workshop: multiple automated welding lines are equipped with ABB robotic arms, and the welding qualification rate of key structural parts reaches 99.97%.
National testing centre: witness the fatigue test of drill pipe on the spot (72 consecutive hours/15,000 times of impact test).
Modular pre-assembly system: 85% of the whole machine parts are pre-assembled in the factory for debugging, which shortens the on-site installation cycle by 40%. Cycle time 40%
The ZGYX-452 drilling rig is equipped with a dual-power intelligent control system, which increases the impact power by 35% through remote commissioning, ensuring fast perforation efficiency in basalt layers.
The whole system has passed the CE certification of the European Union, and the emission of dust is lower than 15 mg/m³.
When the customer’s inspection team visited the UNIQUE intelligent blasting rig at the manufacturing base through the online conference video:
Full-process digital workshop: multiple automated welding lines are equipped with ABB robotic arms, and the welding qualification rate of key structural parts reaches 99.97%.
National testing centre: witness the fatigue test of drill pipe on the spot (72 consecutive hours/15,000 times of impact test).
Modular pre-assembly system: 85% of the whole machine parts are pre-assembled in the factory for debugging, which shortens the on-site installation cycle by 40%. Cycle time 40%.